ShipRepair completed projects

Hull damage, was repaired several damages on the ship hull using cherry pickers, in 27 meters height from dock floor, made and installed additional platforms in engine room

Bottom and Rudder damage. Citius has accident and damage bottom. During docking was changed approx 30 tonbottom plating and repaired rudder

Steelworks in the upper and lower turret areas, which needed to be completely revised and adapted to suit the 1500 meter deep mooring location

Modification will increase the vessel’s capabilities with respect toloading capacity, accommodation and crane capacity. The capacity increase was done by prefabrication and installing sponsons, strengthening deck, enlarging spud cans and adding a new accommodation module with helideck. Furthermore, the existing 900-tonne crane will be replaced by a 1,600-tonne leg encircling crane